V Model vwery imp testing


V Model

Software testing is too important to leave to the end of the project, and the V-Model of testing incorporates testing into the entire software development life cycle. In a diagram of the V-Model, the V proceeds down and then up, from left to right depicting the basic sequence of development and testing activities. The model highlights the existence of different levels of testing and depicts the way each relates to a different development phase.


1.Requirements analysis:
In this phase, the requirements of the proposed system are collected by analyzing the needs of the user(s). This phase is concerned about establishing what the ideal system has to perform. However, it does not determine how the software will be designed or built. Usually, the users are interviewed and a document called the user requirements document is generated. The user requirements document will typically describe the system’s functional, physical, interface, performance, data, security requirements etc as expected by the user. It is one which the business analysts use to communicate their understanding of the system back to the users. The users carefully review this document as this document would serve as the guideline for the system designers in the system design phase. The user acceptance tests are designed in this phase.
2. System Design:
System engineers analyze and understand the business of the proposed system by studying the user requirements document. They figure out possibilities and techniques by which the user requirements can be implemented. If any of the requirements are not feasible, the user is informed of the issue. A resolution is found and the user requirement document is edited accordingly.
The software specification document which serves as a blueprint for the development phase is generated. This document contains the general system organization, menu structures, data structures etc. It may also hold example business scenarios, sample windows, reports for the better understanding. Other technical documentation like entity diagrams, data dictionary will also be produced in this phase. The documents for system testing is prepared in this phase.

3. Architecture Design:
This phase can also be called as high-level design. The baseline in selecting the architecture is that it should realize all which typically consists of the list of modules, brief functionality of each module, their interface relationships, dependencies, database tables, architecture diagrams, technology details etc. The integration testing design is carried out in this phase.

4. Module Design:
This phase can also be called as low-level design. The designed system is broken up in to smaller units or modules and each of them is explained so that the programmer can start coding directly. The low level design document or program specifications will contain a detailed functional logic of the module, in pseudocode – database tables, with all elements, including their type and size – all interface details with complete API references- all dependency issues- error message listings- complete input and outputs for a module. The unit test design is developed in this stage.
5. Unit Testing:
The primary goal of unit testing is to take the smallest piece of testable software in the application, isolate it from the remainder of the code, and determine whether it behaves exactly as you expect. Each unit is tested separately before integrating them into modules to test the interfaces between modules. Unit testing has proven its value in that a large percentage of defects are identified during its use.
6. Integration Testing:
Integration testing is the phase in software testing in which individual software modules are combined and tested as a group. It occurs after unit testing and before system testing. Integration testing takes as its input modules that have been unit tested, groups them in larger aggregates, applies tests defined in an integration test plan to those aggregates, and delivers as its output the integrated system ready for system testing.
7. System Testing:

System testing of software or hardware is testing conducted on a complete, integrated system to evaluate the system’s compliance with its specified requirements. System testing falls within the scope of black box testing, and as such, should require no knowledge of the inner design of the code or logic.

8. User Acceptance Testing:
Acceptance testing is a test conducted to determine if the requirements of a specification or contract are met. User Acceptance Testing (UAT) is a process to obtain confirmation that a system meets mutually agreed-upon requirements.